Kitchens age faster than any other room in an Indian home. Twenty years of tadka, steam and water wear out the cabinets under the sink, crack the tiles behind the hob, rust the galvanised iron pipes inside the walls and overload wiring that was never designed for a microwave, a chimney, a water purifier, an induction hob and a dishwasher. Many families in older flats and bungalows still cook on a builder's platform — granite on a kadappa or RCC slab, with open shelves or a few shutters below — and want the storage, finish and convenience of a modular kitchen.

The question "how much does a kitchen renovation cost?" draws answers from ₹40,000 to ₹8 lakh, and all of them can be honest, because they describe different jobs. Replacing shutters and hinges on sound cabinets is one job. Fitting new modular cabinets under an existing platform is another. Breaking out the old platform, renewing the pipes and wiring, relaying the floor and building a new kitchen from bare walls is a third. This article prices all three, line by line, using the same rates as this site's modular kitchen guides, so that the numbers can be checked and compared.

The reference throughout is the kitchen used in this site's 3BHK kitchen cost guide: an L-shaped kitchen of about 8 × 10 ft (2450 × 3050 mm) with a tall unit, lofts and a small utility area. Smaller and larger kitchens are priced by layout later in the article. All prices are indicative October 2026 ranges for tier-2 cities such as Surat, excluding GST and appliances unless stated; metros typically run higher.

Three scopes of kitchen renovation

The first step in any budget is to name the scope. A refresh keeps the cabinets, the platform and the services, and changes what is seen and touched: shutters, hinges and handles, perhaps the backsplash, and paint. A partial renovation keeps the walls, floor and services but replaces the storage — typically new modular cabinets fitted under an existing granite platform, with a new sink, backsplash and some electrical points. A full renovation strips the kitchen to its walls and slab, renews water lines and kitchen circuits, relays the floor, repairs the walls and installs a complete new modular kitchen with a new counter.

ScopeWhat changesWhat staysIndicative cost, reference kitchen (October 2026)Typical time
RefreshShutters, hinges, handles, backsplash tiles, paintCarcasses, platform, plumbing, wiring, floor≈ ₹34,000–73,0001–2 weeks
Partial renovationNew modular cabinets, sink, backsplash, some electrical points, paintExisting granite platform, floor, main pipes and wiring≈ ₹2.66–3.82 lakh (mid-range)4–6 weeks
Full renovationEverything to bare walls: platform, pipes, kitchen circuits, floor, walls, new kitchenStructure, window, gas supply point≈ ₹2.66–4.13 basic · ₹3.63–5.56 mid · ₹5.61–8.68 lakh premium7–11 weeks
Full renovation with layout changeAs full, plus moving the sink, hob or a wallStructureFull renovation plus plumbing, gas and civil quotesAdd 1–3 weeks; approvals may be needed
Fig. 1 — Kitchen renovation by scope, mid-points (₹ lakh, before GST) 012345 ≈ 0.53 cabinets 2.6sink, splash,points, paint≈ 3.24 cabinets 2.6counter, sink,splash, utilityrenovationlayer ≈ 0.93≈ 4.6 RefreshPartial (mid)Full (mid) Scale: 60 px = ₹1 lakh. Mid-points of the ranges in the tables below; appliances and GST excluded. Full renovation = complete new kitchen (as in this site's 3BHK kitchen guide) + renovation layer.
Fig. 1 — Three scopes compared, reference 8 × 10 ft L-kitchen (₹ lakh, mid-points)

How Indian kitchens got here

Most Indian homes built before the spread of modular kitchens had a masonry kitchen: a platform of granite, kadappa or polished stone laid on an RCC or stone slab, supported on brick or concrete walls, with open shelves or carpenter-made shutters beneath, a stainless-steel sink set into the stone, and white glazed tiles to full height on the walls. Water came through galvanised iron pipes, and the kitchen had perhaps two sockets. That kitchen was robust, but it was built for a different life — fewer appliances, more open storage, and cooking on a gas stove that stood on the platform. This site's history of the Indian kitchen traces that change in detail.

The modular kitchen arrived in Indian cities as factory-made cabinets, soft-close hardware, built-in hobs and chimneys became widely available, and it became the default in new flats over the last two decades. The kitchens now being renovated are therefore of two kinds: older masonry kitchens being converted to modular for the first time, and early modular kitchens — often in particle board or MDF — whose carcasses have swollen near the sink and whose hinges have failed. The two need different budgets. A masonry kitchen usually needs the full renovation layer; an early modular kitchen sometimes needs only new carcasses under the sink and a refresh elsewhere.

The full renovation, line by line

A full kitchen renovation is best priced as two parts added together. The first is the new kitchen itself, priced exactly as it would be in a new flat. This site's 3BHK kitchen guide puts a complete L-shaped kitchen with tall unit, lofts, counter, sink, backsplash, utility storage and kitchen electrical points at about ₹2.03–2.90 lakh basic, ₹3.00–4.33 lakh mid-range and ₹4.98–7.45 lakh premium. The second is the renovation layer — the work that exists only because there is an old kitchen to remove and old services to replace.

Line (reference L-kitchen with utility)Basic (₹ lakh)Mid-range (₹ lakh)Premium (₹ lakh)Rate basis (indicative October 2026)
New kitchen — cabinetry, counter, sink, backsplash, utility units, kitchen points2.03–2.903.00–4.334.98–7.45As this site's 3BHK modular kitchen guide
Remove old platform, cabinets and tiles; cart debris0.10–0.250.10–0.250.10–0.25₹10,000–25,000 per kitchen
Renew water supply lines (GI to CPVC or PPR)0.20–0.300.20–0.300.20–0.30Kitchen and utility lines
Remove and relay floor, ≈ 120 sq ft0.12–0.240.12–0.240.12–0.24Removal ₹12–40 + vitrified laid ₹85–160 per sq ft
Rewire kitchen circuits back to the distribution board0.15–0.350.15–0.350.15–0.35Dedicated circuits for hob, oven, dishwasher, chimney
Wall repair and repaint, ≈ 300 sq ft0.06–0.090.06–0.090.06–0.09Premium emulsion ₹20–30 per sq ft all-in
Renovation layer subtotal0.63–1.230.63–1.230.63–1.23≈ ₹63,000–1.23 lakh
Total, before appliances and GST2.66–4.133.63–5.565.61–8.68New kitchen + renovation layer

Two points help in reading the table. First, the renovation layer is roughly the same at every level, because removing an old platform or renewing pipes costs about the same whatever the shutters are made of; it therefore weighs heavily on a basic kitchen (about a quarter of the total) and lightly on a premium one (about a seventh). Second, the kitchen-circuit line is the one most often cut and most often regretted. An older kitchen may have only one or two sockets on a shared circuit; a modern kitchen with a chimney, hob ignition, microwave or oven, water purifier, mixer and perhaps a dishwasher needs properly rated dedicated circuits with MCB and RCCB protection, installed by a licensed electrician.

The partial renovation in the scope table is built the same way, with the existing platform kept and utility storage excluded: mid-range cabinetry at ₹2.20–3.00 lakh, a new sink and faucet at ₹0.10–0.18 lakh, a backsplash at ₹0.15–0.30 lakh, kitchen electrical points at ₹0.15–0.25 lakh and a repaint at ₹0.06–0.09 lakh — about ₹2.66–3.82 lakh in all. It suits kitchens whose platform is sound and at a comfortable height, and whose pipes and wiring have been checked.

What comes out, and what goes in

The physical difference between an old masonry kitchen and a modular one explains much of the renovation cost. The old platform is a heavy stone slab on brick or concrete supports, often 600–650 mm deep and at whatever height the builder chose — sometimes as low as 800 mm, sometimes over 900 mm. Removing it means breaking the supports, lifting the stone, carting the debris and repairing the wall plaster and the floor where the supports stood. The modular kitchen that replaces it is a set of 18 mm board carcasses on adjustable legs behind a plinth, with the counter laid on top at a chosen working height, usually 850–900 mm.

Fig. 2 — Section: what comes out and what goes in (scale 1 mm = 0.3 px) A — Old masonry platform (removed) B — New modular base unit 800–920(as built) 600–650 deep granite 18–20kadappa or RCC slab brick or concretesupports, open shelves 850–900 100–150legs 600 incl. counter overhang quartz or granite 20 18 mm BWR / HDHMRcarcass, BWP at sink drawers on tandemrunners plinth Removing A also exposes wall plaster and floor under the supports — both are in the renovation layer. B sits on legs so the floor is tiled first and runs under the units; old pipes inside the wall are best renewed before B is measured.
Fig. 2 — Old masonry platform versus new modular base unit (section, mm)

The renovation layer, item by item

Each line of the renovation layer has a reason and a risk. The figures below are the per-item rates behind the subtotal in the main table, with notes on what drives them up.

ItemIndicative rate (October 2026)Reference kitchenWhat drives it up
Old platform, cabinets and dado tiles removed; debris carted₹10,000–25,000 per kitchen₹10,000–25,000Thick RCC slabs, society debris rules, upper floors without a lift
Water supply lines renewed₹20,000–30,000 for kitchen and utility₹20,000–30,000Long runs back to the shaft; concealed lines in old plaster
Floor removed and relaid in vitrified tile≈ ₹97–200 per sq ft (removal + laid)≈ 120 sq ft: ₹11,640–24,000Uneven screed, level changes at the door
Kitchen circuits rewired to the DB₹15,000–35,000₹15,000–35,000Distance to the DB; a new DB if the old one is full or unsafe
Wall plaster repair and repaint₹20–30 per sq ft (premium emulsion all-in)≈ 300 sq ft: ₹6,000–9,000Hollow plaster, damp and salt marks behind old tiles
Gypsum false ceiling (optional)₹60–80 per sq ft plain≈ 80 sq ft: ₹4,800–6,400Coves, profile lights, access panels for ducts
Chimney duct core through the wall (optional)Contractor quoteOne openingRCC wall or beam in the way — never cut structure without an engineer
Moving the sink or hob (optional)Plumbing and gas quotesVariesDrain slope to the shaft; gas line changes by an authorised agency

The optional lines are where budgets break. Moving a sink to another wall needs a drain with enough slope to reach the building's shaft, which may mean raising the floor or running a pipe through a wall; moving a hob means re-routing the gas line, which must be done by the gas company or an authorised installer, especially for piped natural gas. Cutting an opening for a chimney duct in an RCC wall or beam is a structural question and should never be done without a structural engineer's approval. Where these moves are not essential, a better layout around the existing sink, hob and duct positions is usually the cheaper path.

Costs by kitchen layout

Not every kitchen is an 8 × 10 ft L. The table below applies the same method to other layouts, using this site's 2026 cabinetry bands by layout, a mid-range figure of about ₹0.60–1.03 lakh for the counter, sink, backsplash and kitchen points (from the reference kitchen), and the same renovation layer. Utility storage is excluded here; add about ₹0.15–0.60 lakh if a utility area is fitted out.

Layout (typical size)Cabinetry band (₹ lakh)Counter, sink, backsplash, points (₹ lakh)Renovation layer (₹ lakh)Indicative full renovation (₹ lakh)
Straight, 8–10 ft single run1.2–2.00.60–1.030.63–1.232.43–4.26
L-shape, 10 × 8 ft and up1.5–3.00.60–1.030.63–1.232.73–5.26
Parallel, 8 × 10 ft, 1200 aisle1.5–3.00.60–1.030.63–1.232.73–5.26
U-shape, 10 × 10 ft and up2.5–4.00.60–1.030.63–1.233.73–6.26
Island, 14 × 12 ft and up4.0 +0.60–1.03 +0.63–1.23 +5.23 + (island services extra)

Layout changes the cabinetry far more than the renovation layer. A U-shaped kitchen costs more mainly because of its extra corners and accessories, not because it is harder to strip out. An island adds its own services — a sink or hob on the island needs drain, water, power and sometimes ducting through the floor or ceiling — which should be priced separately after a site survey.

Refresh options: when the carcasses are sound

If the cabinets are dry, square and firmly fixed, and only the faces and hardware look tired, a refresh can transform a kitchen for a fraction of the cost. The test is simple: open the cabinet under the sink. If the base and sides are swollen, delaminated or soft, the carcass needs replacing at least there. If they are firm and dry, new shutters, hinges and handles on the existing boxes are usually a sound investment. The reference kitchen carries about 45 sq ft of base and wall unit fronts.

Refresh itemQuantityIndicative rate (October 2026)Amount (₹)
New laminate shutters≈ 45 sq ft₹350–650 per sq ft15,750–29,250
— or acrylic shutters≈ 45 sq ft₹900–1,500 per sq ft40,500–67,500
— or PU painted shutters≈ 45 sq ft₹1,000–1,800 per sq ft45,000–81,000
Soft-close hardware upgradeTwo most-used units₹5,000–15,000 per unit10,000–30,000
New backsplash tiles≈ 35–50 sq ftTile ₹65–160 per sq ft (basic band ₹0.02–0.05 lakh)2,000–5,000
Repaint kitchen walls and ceiling≈ 300 sq ft₹20–30 per sq ft6,000–9,000
Refresh total with laminate shutters33,750–73,250

The laminate refresh lands at about ₹34,000–73,000. Upgrading the shutters to acrylic or PU moves it to roughly ₹58,500–1.25 lakh, and a new counter — granite at about ₹10,000–15,000 or mid-range quartz at about ₹20,000–30,000 for the reference kitchen, as in the 3BHK guide — can be added if the old stone is cracked or stained. A refresh is not the right choice when the plumbing leaks, the wiring is unsafe or the layout does not work; spending on new faces for a kitchen that must be rebuilt in two years is the most expensive kind of saving.

What to keep and what to replace

ElementKeep ifReplace ifCost of getting it wrong
CarcassesDry, square, firmly fixed; no swelling under the sinkSwollen, delaminated, particle board near waterNew shutters on failing boxes
Granite platformSound stone, right height and layoutCracked, wrong height, poor layoutLiving with a bad working height for years
Water pipesRecent CPVC or PPR, good pressureGalvanised iron, rust-coloured water, low pressureLeaks inside new cabinets
Kitchen wiringDedicated circuits, earthing and RCCB presentShared circuit, warm switches, no earthFire and shock risk; breaking new tiles later
FloorSound, level, no hollow tilesHollow, cracked, or units need a level floorCracked tiles under new units
WindowSeals well, opens freelyLeaking or corrodedWater damage to new wall units
Exhaust or chimney ductShort, straight route to outsideLong bends, no outside wallPoor extraction; grease on new cabinets

How long a kitchen renovation takes

A full kitchen renovation is short compared with a whole-home renovation, but the family is without a kitchen for most of it, so the sequence matters. The key rule — the same one this site gives for home renovations — is to measure joinery only after walls and floors are final. That means strip-out, plumbing, wiring, floor and wall work come first; the final measurement follows; and factory production of the cabinets happens while the family cooks in a temporary kitchen.

Fig. 3 — Full kitchen renovation programme (typical, weeks) 0123456789 Design, survey, approvals Strip-out and debris Plumbing and wiring Floor, dado, plaster repair Final site measurement Factory production Install units, counter Appliances, paint, snags Kitchen out of use from week 1.5 to about week 9 — plan a temporary kitchen. Counter templating follows base-unit fixing. Range in practice ≈ 7–11 weeks; society working hours, approvals and material lead times add to it.
Fig. 3 — Typical full kitchen renovation programme (weeks)
StageTypical durationWhy it cannot be rushed
Design, survey, selections1–2 weeksAppliance models and sizes must be fixed before drawings
Strip-out and debris2–4 daysNoise limits and society debris rules
Plumbing and wiring≈ 1 weekPressure test pipes and test circuits before closing walls
Floor, dado and plaster repair≈ 1–1.5 weeksAdhesive and plaster need time before cabinets are fixed
Factory production≈ 3–5 weeksCutting, edge-banding and finishing after final measurement
Installation, counter, appliances, snags≈ 1–1.5 weeksCounter is templated after base units are fixed and levelled
Total from design start≈ 7–11 weeksKitchen out of use for roughly 5–8 weeks

Planning the renovation on the plan

Before any demolition, the renovation should be drawn on a measured plan that shows every service: the water inlet, the drain, the gas point, the window, the duct route for the chimney, the distribution board, and every socket with its height. Fig. 4 shows the reference kitchen marked up this way. A plan like this lets plumbers, electricians and the cabinet maker work from one drawing, and it is the single best protection against the expensive clash — a socket behind a tall unit, a drain under a drawer stack, a duct through a beam.

Fig. 4 — Services plan for a full renovation (scale 1 mm = 0.12 px) 3050 2450 hob on 600 modulesink tall utility1200 deep window duct route to outside drainwater in gas valve Legend socket or point drain / water inlet gas isolation valve duct, window Point heights Counter sockets 1050–1150 Chimney socket abovewall units ≈ 2100+ Under-sink: purifierand dishwasher Keep the sink near the existing drain and the hob near the gas point; moving either adds plumbing, gas and civil costs. Fix appliance models before this plan is frozen — sockets, cut-outs and the tall unit depend on them.
Fig. 4 — Reference L-kitchen 3050 × 2450 mm: renovation services plan (mm)

Living through a kitchen renovation

Families who stay at home during the work need a temporary kitchen for five to eight weeks. A table with an induction cooktop, a microwave, a kettle and a water purifier in the dining area, a basin or the utility tap for washing, and a few storage boxes covers most needs; plan sockets on a safe circuit and keep cooking away from dust. Dust control matters too: seal the kitchen door with plastic sheet, keep the work area under negative ventilation with an exhaust fan or open window where possible, and agree daily cleaning with the contractor. In housing societies, check the permitted working hours, the rules for carrying debris through the lobby and lift, and any refundable deposit; this site's renovation guides note typical society deposits and charges of about ₹10,000–30,000 for a whole-home job, usually less for a kitchen.

Where kitchen renovation is heading

Three changes are shaping kitchen renovation in Indian cities. Piped natural gas is replacing cylinders in many areas, which fixes the hob position more firmly and makes gas-line changes a job for the gas company. Electrical loads are rising, with induction hobs, built-in ovens, dishwashers and air fryers, so kitchen circuits are being designed rather than extended. And factory joinery is getting more precise and faster, with 3D measurement and CNC cutting shortening production times. In Aaditya Interior's renovation projects, the most reliable budgets come from the same discipline every time: survey the services first, fix the appliances and the layout, then price the renovation layer and the new kitchen separately, so that each can be compared with the market.

Rules for budgeting a kitchen renovation

  • Name the scope — refresh, partial or full — and get every quotation for the same scope.
  • Price a full renovation as new kitchen plus renovation layer; on the reference kitchen the layer is about ₹63,000–1.23 lakh.
  • Open the cabinet under the sink before choosing a refresh; swollen or soft carcasses need replacing.
  • Never skip dedicated kitchen circuits, RCCB protection or the renewal of old galvanised pipes.
  • Keep the sink near the drain and the hob near the gas point unless the gain justifies new plumbing and gas work.
  • Do not cut RCC walls or beams for ducts without a structural engineer's approval.
  • Measure the cabinets only after floors, dado and plaster are complete, and fix appliance models first.
  • Keep a 10–15 per cent contingency on the renovation layer, and check whether quotes include GST and debris removal.

Frequently asked questions

How much does it cost to renovate a kitchen in India in 2026?

Indicatively, about ₹34,000–73,000 for a refresh, about ₹2.66–3.82 lakh for new mid-range cabinets under an existing platform, and about ₹2.66–4.13 lakh basic, ₹3.63–5.56 lakh mid-range or ₹5.61–8.68 lakh premium for a full renovation of an 8 × 10 ft L-shaped kitchen with utility, before appliances and GST.

What does it cost to convert an old kitchen platform to a modular kitchen?

Removing the old platform and carting debris costs about ₹10,000–25,000. If the granite is kept and modular units are fitted beneath it, the job is a partial renovation at about ₹2.66–3.82 lakh mid-range. If the platform is replaced with a new counter at a better height, it becomes a full renovation, about ₹3.63–5.56 lakh mid-range for the reference kitchen.

Can only the kitchen shutters be replaced?

Yes, if the carcasses are dry, square and firmly fixed. New laminate shutters for about 45 sq ft of fronts cost about ₹15,750–29,250, acrylic about ₹40,500–67,500 and PU about ₹45,000–81,000, plus hinges and handles. Check the cabinet under the sink first; swollen boards there mean at least that unit needs a new carcass.

How long does a kitchen renovation take?

A full renovation typically takes about 7–11 weeks from design start, with the kitchen out of use for roughly 5–8 weeks while services, floors and walls are completed and the cabinets are made in the factory. A refresh takes one to two weeks, and a partial renovation about four to six.

Is a kitchen renovation worth doing before selling a flat?

Usually a refresh is enough — new shutters, hardware, a clean backsplash and paint make an old kitchen presentable for a modest outlay. A full renovation before sale rarely returns its full cost, because buyers often want to choose their own kitchen. Fix leaks and unsafe wiring in either case.

Sources & standards

  1. Bureau of Indian Standards — IS 303 (plywood for general purposes) and IS 710 (marine plywood), for carcass grades
  2. Bureau of Indian Standards — IS 732 (electrical wiring installations) and IS 12640 (residual current operated circuit breakers), for kitchen circuits
  3. Bureau of Indian Standards — IS 15778 (CPVC pipes for hot and cold water) and IS 15801 (polypropylene random copolymer pipes), for supply lines
  4. National Building Code of India 2016, Part 8 (Building Services) and Part 9 (Plumbing Services) — electrical, ventilation and plumbing in kitchens
  5. Neufert, Architects' Data — kitchen planning dimensions and counter heights
  6. Aaditya Interior blog — Modular Kitchen Cost for a 3BHK Flat; Modular Kitchen Price in India; Home Renovation Cost Per Sq Ft (for the kitchen and renovation rates reused here)
  7. Price ranges: indicative October 2026 estimates — confirm locally before budgeting
Discuss your project

Keep Reading

Related articles

All articles →
Turnkey vs Design-Only Interior Services: Cost Comparison — cover
Cost Guides

Turnkey vs Design-Only Interior Services: Cost Comparison

On a mid-range 1,250 sq ft 3BHK the two routes land close together — about ₹20–22 lakh design-only and ₹21–23.5 lakh turnkey (indicative October 2026) — because turnkey adds a firm's coordination margin while design-only quietly moves rework, wastage and delay onto the family. The cheaper route on paper is cheaper in fact only when the family has a full drawing set, a reliable contractor and time to be on site.

Where to Save and Where to Spend in Home Interiors — cover
Cost Guides

Where to Save and Where to Spend in Home Interiors

Spend on what is used every day and is hard to change later — kitchen carcass and hardware, wet-area board grades, waterproofing, wiring and plumbing — and save on what can be upgraded cheaply after moving in: decorative lights, feature walls, curtains, loose decor and ceiling extent. In a mid-range 1,250 sq ft Surat 3BHK of about ₹19 lakh, moving roughly ₹1.15 lakh from decoration to these basics changes the home's life far more than its look.

Interior Design Payment Schedule: What to Pay and When — cover
Cost Guides

Interior Design Payment Schedule: What to Pay and When

A balanced home interior is paid in verified stages: about 10–20 per cent to book, 25–30 per cent when materials arrive, 20–25 per cent at carcasses, 15–20 per cent at finishes, 5 per cent at handover and 5–10 per cent held until snags close. Design fees, factory-made modular packages and loose furniture each follow their own milestones, so plan the cash month by month.