How to Read an Interior Design Quotation

How to Read an Interior Design Quotation — cover

Every interior project in India reaches the same moment: the drawings are ready, the 3D views look right, and a PDF arrives with a total at the bottom that is several lakh rupees larger than the family expected. Most people read that number first, then scroll up looking for something to cut, and finally compare it with another firm's total that is "two lakh cheaper". Very few read the quotation the way a contractor or quantity surveyor does — line by line, unit by unit, specification by specification — and that is exactly where the money is decided.

A quotation is not a price list. It is the written promise of what will be built, in what material, to what size, with which hardware, at what rate, under which conditions. A cheaper quote is often a smaller scope, a thinner board, a cheaper hinge, an unmeasured loft, a ceiling quoted per sq ft of plain gypsum when the drawing shows coves, or a long list of exclusions on the last page. Families who sign on the total discover these differences during execution, as "extras". Families who read the quotation properly discover them before signing, when they cost nothing to fix.

This guide walks through an interior quotation the way Aaditya Interior's team reviews one before it goes to a client: the parts of the document, the units of measurement and what each actually measures, the specification lines that drive price, a worked example for a mid-range 3BHK, taxes and exclusions, payment terms, how to compare three quotes fairly, and the red flags that predict disputes. Prices are indicative October 2026 figures consistent with the cost guides elsewhere on this blog.

Why interior quotations look the way they do

The modern interior quotation grew out of two older traditions. The first is the carpenter's estimate. For decades, most Indian homes were furnished by a mistri working on site: the family or the designer bought the plywood, laminate and hardware, and the carpenter quoted labour — sometimes per day, more often per square foot of finished furniture. Because material and labour were bought separately, the client saw exactly what went in, but nobody owned the whole result, and the cost was known only at the end.

The second tradition is the civil contractor's bill of quantities, or BOQ — a schedule listing every item of work with its description, unit, quantity and rate, prepared from drawings and measured according to agreed rules. Indian civil practice measures work according to the IS 1200 series of standards, which set out how each trade is measured, and public works departments publish schedules of rates in the same format. When design-and-build interior firms and modular factories became common from the 2000s and 2010s, they borrowed the BOQ format and the per-square-foot rate from these two traditions: furniture priced per sq ft of front elevation, ceilings per sq ft of area, painting per sq ft of paintable surface, electrical work per point.

Today a quotation may come from an independent designer with a separate contractor, from a design-and-build studio, from a modular-kitchen brand, or from an online package company quoting per BHK. The format differs, but a fair quotation of any type answers the same seven questions: what, how big, how many, in what material, with what hardware and finish, at what rate, and on what terms. Anything a quotation does not state in writing should be assumed to be the cheapest option or not included at all.

Anatomy of a quotation: the parts and the columns

A complete interior quotation has a cover section, a bill of quantities divided by trade or by room, a summary, and terms. The cover section identifies the firm with its registered address and GSTIN, the client, the site address, the date, a quotation number, a validity period, and — most importantly — the drawing set and revision it is based on. A quotation that does not reference drawings has nothing to be checked against. The BOQ is the heart of the document. Each row is one item, and each item needs its own description, size, unit, quantity, rate and amount.

Fig. 1 — A quotation page, annotated Firm, GSTIN, client, site address Quote no. · date · valid 30 days · Drg. set R2 No.Item and specificationSizeUnitQtyRate · Amt 3.1Wardrobe, MBR, 18 BWR2100×2100sqft47.5 3.2Loft over 3.1, laminate2100×600sqft13.6 3.3Soft-close hinges (brand)nos8 Sub-totalGST shown separately Terms: payment, exclusions, warranty 123456 1 · Drawing referencethe revision the price is based on 2 · Specificationboard, thickness, finish, brand 3 · Size in mmcheck against the drawing 4 · Unitsq ft elevation, rft, nos, LS 5 · Rate and amountqty × rate = amount, every row 6 · Termspayment, exclusions, warranty,variations, timeline Read the six places first. If any is missing, ask for it in writing before discussing the total.
Fig. 1 — Anatomy of a quotation page: the six places to look first
Column or sectionWhat it must containWhat to check
Item number and locationRoom and item, e.g. "3.1 Master bedroom wardrobe"Every item on the drawings has a row; nothing is merged into "misc."
Description and specificationBoard, thickness, grade, finish, edge band, hardware brand and typeVague words such as "premium" or "branded" without a name or grade
SizeWidth × height (× depth) in mm or ftMatches the drawing; lofts and returns listed separately
Unitsq ft, running ft, nos, point, lump sumUnit suits the item; no lump sums for measurable work
QuantityCalculated from the sizeRecalculate a few rows yourself
RatePrice per unitCompare with market bands; note if GST is inside or outside
AmountQuantity × rateArithmetic is right; totals add up
Terms and exclusionsValidity, payment, timeline, warranty, variations, exclusionsLong exclusion lists hidden on the last page

Units of measurement: what you are actually paying for

The single most misunderstood part of an interior quotation is the unit. A rate of ₹1,600 means nothing until it is clear whether it is per square foot of front elevation, per square foot of floor area, per running foot, or per piece. Different firms use different units for the same item, and the same unit can be measured in different ways. The table summarises the units in common Indian use and how each is usually measured.

UnitUsed forHow it is measuredCommon trap
Sq ft of elevation (front area)Wardrobes, lofts, TV units, crockery units, vanitiesOverall width × overall height of the front faceLoft or filler counted at full rate; height measured to slab instead of to unit top
Running foot (rft)Modular kitchens, cove lighting, skirting, profilesLength along the wall or counterUnclear whether wall units are included in the kitchen rft
Sq ft of areaFalse ceilings, flooring, wall panellingPlan area or wall area as installedCoves and drops measured as flat area; wastage not stated
Sq ft of paintable areaPainting, texture, wallpaperWall and ceiling surfaces, openings deducted per agreed ruleOpenings not deducted; ceiling counted twice
Per pointElectrical and plumbing workEach switch, socket, light or water outlet"Point" definition differs — wire length and switch type unstated
Numbers (nos)Hardware, lights, appliances, accessoriesCount of piecesBrand and model not named
Lump sum (LS)Demolition, debris removal, cleaning, small civil itemsFixed price for a defined taskLarge items in lump sum cannot be checked or varied fairly
Per sq ft of carpet areaPackage quotes for a whole homeCarpet area of the flatScope inside the package unclear; extras outside it

Sq ft of elevation is the unit that causes most confusion. It measures the front face of a unit, not the material used. A wardrobe 2100 mm wide and 2100 mm high has 4.41 m², or about 47.5 sq ft, of elevation, whether it is 450 mm or 600 mm deep and whether it has four shelves or ten. That is why the rate per sq ft must be read together with depth, internal configuration and accessories: a firm quoting ₹1,400 for a 450 mm deep wardrobe with plain shelves may be dearer than one quoting ₹1,700 for a 600 mm deep wardrobe with drawers and a trouser rack included.

Fig. 2 — Wardrobe with loft, 2700 mm floor to false ceiling (1 m = 120 px) 2100 2100 600 2700 LOFT WARDROBE 4 shutters The calculation Wardrobe: 2.1 × 2.1 m = 4.41 m² = 47.5 sq ft of elevation Loft: 2.1 × 0.6 m = 1.26 m² = 13.6 sq ft of elevation Total ≈ 61 sq ft At mid-range ₹1,200–2,200 ≈ ₹73,000–1,34,000 Ask the quote to state · depth (450 / 560 / 600) · loft rate if different · drawers, racks, mirror — included or extra · filler above loft — who closes the gap to ceiling Same 61 sq ft, very different wardrobes: depth, internal fittings and shutter finish decide whether ₹1,200 or ₹2,200 is fair.
Fig. 2 — Measuring a wardrobe by sq ft of elevation (mm)

The same discipline applies to every unit. A modular kitchen quoted per running foot should state whether that foot includes base units only, base and wall units, or base, wall and tall units, and whether the countertop, sink, hob cut-out and accessories sit inside or outside the rate. A false ceiling quoted at ₹70 per sq ft is a plain gypsum ceiling; a ceiling with coves, drops and profile slots belongs in the ₹80–180 band, and the cove itself may be measured separately in running feet. An electrical "point" should define the wire size and length allowance, conduit type, switch and socket range — a point of 6 m of wire in an existing conduit is a very different job from a new point chased into a wall.

Specifications: the lines that decide the price

Two quotations for the same wardrobe can differ by forty per cent and both be fair, because they describe different wardrobes. The specification line is where that difference lives. For built-in furniture, the minimum a specification should state is the carcass board and its grade (for example BWR or BWP plywood conforming to IS 303 or IS 710, or HDHMR), its thickness (18 mm for carcasses is standard, with 6–9 mm or 12 mm backs), the shutter board and finish (laminate thickness, acrylic, PU paint or veneer with polish), the edge banding (thickness and material), the inner surface finish, the hinges and drawer channels by type and brand, and the handles.

Vague line (avoid)Proper specification (ask for)Why it matters
Wardrobe in premium ply18 mm BWR plywood carcass (IS 303), 9 mm back, 0.8 mm inner laminate"Premium" can mean any grade or thickness
Laminate finish shutters1 mm decorative laminate, named range and shade code, 2 mm PVC/ABS edge bandThinner laminates and paper edge tape chip and peel
Branded hardwareSoft-close concealed hinges and full-extension soft-close channels, brand and series namedHardware fails first; unbranded parts cost a fraction
Kitchen with all accessoriesList: cutlery tray, plate rack, bottle pull-out, corner unit — each with size and brand"All" becomes whatever was cheapest
Gypsum ceiling with cove12.5 mm gypsum board on GI frame, cove profile per drawing, cove measured in rftFraming and cove detail drive the rate
Premium paintNamed emulsion range, putty + primer + 2 coats, surfaces listedCoats and preparation are where corners are cut
Lighting as per designEach fitting type, wattage, colour temperature, CRI and quantityAllows like-for-like comparison and checking on site

Material grade claims should be checkable. Plywood carries an IS mark and a licence number on genuine branded sheets; laminate packs carry a shade code and thickness; hardware arrives in the brand's packaging. A good contract states that the client or designer may inspect material on delivery and reject anything that does not match the specification. This single clause does more to keep a quotation honest than any amount of bargaining over the rate.

A worked example: mid-range 3BHK quotation

The table below shows a mid-range quotation for a 3BHK of about 1,250 sq ft carpet area, using midpoints of the bands from this blog's 3BHK cost guide. It is illustrative, not a price for any particular project, but it shows how the sections of a real quotation add up and where the money goes. Note that the site work and contingency line is real money: minor civil changes, plumbing tweaks, debris removal, protection and a buffer for what is found when walls are opened.

SectionTypical contentsIllustrative amount (₹ lakh)Share
Kitchen and countertopL-shape modular kitchen, quartz counter ≈ 45 sq ft2.8515 %
WardrobesThree rooms, ≈ 160 sq ft elevation incl. lofts2.8015 %
Beds and side tablesThree beds with storage2.2012 %
Living, foyer, pooja, utility, studyTV and crockery units, shoe unit, mandir, utility, desk2.6514 %
False ceiling and painting≈ 800 sq ft gypsum with coves; premium emulsion1.9510 %
Electrical and lightingPoint changes, cove LED, panels, pendants1.257 %
Bathroom fittingsThree baths, mid-range sets with labour1.357 %
Curtains and soft furnishingsFabric, tracks, blinds1.458 %
Site work, civil changes and contingencyMinor civil, plumbing, debris, protection, buffer2.5013 %
Total before GST and design fee≈ ₹1,520 per sq ft of carpet19.00100 %
Fig. 3 — Section shares of a ₹19 lakh quotation (bar length = share; 10 % = 40 px) Furniture and carpentry Ceiling and painting Electrical and lighting Bathroom fittings Soft furnishings Site work and contingency ₹10.50 L · 55 % ₹1.95 L · 10 % ₹1.25 L · 7 % ₹1.35 L · 7 % ₹1.45 L · 8 % ₹2.50 L · 13 % Kitchen + wardrobes + beds = ₹7.85 L, about 41 % Add on top GST (commonly 18 %) ≈ ₹3.4 L Design fee, if separate Loose furniture, appliances More than half of any interior quotation is fitted furniture — so the board, finish and hardware lines deserve more attention than any other part of the document. A quote far below this shape usually has a missing section, not a better price.
Fig. 3 — Where ₹19 lakh goes in a mid-range 3BHK quotation (illustrative)

Read in this way, the quotation tells a story. If the furniture share is much lower than about half, check whether beds, the study or the crockery unit have been left out. If the site work line is missing entirely, expect it to return as extras. If the electrical line is very small, the lighting design may not have been priced at all. And if GST is not mentioned, ask whether every rate includes it or excludes it — on a ₹19 lakh project the difference is over three lakh rupees.

Exclusions, provisional sums, contingency and GST

The gap between the quoted total and the final bill almost always comes from four places. The first is exclusions: items that are not part of the quotation at all. Loose furniture, appliances, ACs, curtains, decor, light fixtures chosen later, society deposits and debris charges are commonly excluded, and that is fine as long as they are listed and the family budgets for them. The second is provisional sums — allowances for work that cannot be measured until site conditions are known, such as civil repairs behind old tiles or electrical upgrades after a load check. A provisional sum should state what it covers and the rates at which the actual work will be billed.

The third is contingency. Elsewhere on this blog, a contingency of about five to eight per cent agreed in advance is recommended for larger homes, and the 3BHK cost guide builds a 10–15 per cent buffer into its site-work line for renovation work. A quotation without any contingency is not cheaper; it simply moves the uncertainty to the client. The fourth is GST. Interior contracts and most materials commonly attract GST at 18 per cent; the quotation should show it as a separate line with the firm's GSTIN, and the tax invoice should match it. Rates should be marked clearly as inclusive or exclusive of GST.

ItemHow it should appearTypical allowance (indicative Oct 2026)Question to ask
Loose furnitureListed as excluded or quoted separately₹1.5–5 lakh+ for a 3BHK by levelWhich pieces are in, which are out?
AppliancesExcluded; sizes fixed in drawingsRetail pricesAre cut-outs sized for the chosen models?
Electrical upgradesProvisional sum with per-point rates₹30,000–70,000Has a load calculation been done?
Civil repairs after openingProvisional sum with item rates₹20,000–45,000 per room openedAt what rates will extra work be billed?
ContingencyStated percentage or amount5–8 % new; 10–15 % renovationWho approves spending it?
GSTSeparate line with GSTINCommonly 18 % on interior contractsAre rates inclusive or exclusive?
Design and supervision feeSeparate unless design-and-buildPer sq ft, lump sum or about 8–12 % of project costHow many site visits and revisions are included?

Payment terms, timeline, variations and warranty

The terms page decides how the relationship works when something goes wrong, so it deserves as much attention as the prices. A balanced execution payment schedule starts with a booking advance of about 10–20 per cent, ties later payments to visible progress — material delivered, carcasses installed, shutters and finishes complete — and keeps a retention of about 5–10 per cent until the snag list is closed. The design fee, where it is separate, is usually paid in stages tied to concept, detailed drawings and supervision. A schedule that asks for most of the money before work is visible on site shifts all of the risk to the client.

Fig. 4 — Cumulative payment vs work delivered (x: weeks, y: per cent of contract) 0255075100 03691215 booking 15 material / production 35 install 25 finish 15 retention 10 money paid work delivered Healthy schedules keep the gold line close to the blue line. A large gap early on means the client is financing the project; the retention after snags is what keeps the last 5 per cent of the work from being forgotten. Percentages are illustrative; balanced schedules vary between firms and project types.
Fig. 4 — Money paid versus work delivered over a 14-week project (illustrative, %)

The production payment in the schedule above is the one point where money runs ahead of visible work: factory-made furniture needs material bought and cut before anything reaches site. That is normal and fair, provided the client can see the material order or visit the factory, and provided the schedule pulls back into balance at installation. Variations — any change after signing — should be priced in writing before they are carried out, using the quotation's own rates where possible. The quotation should also state the timeline with its dependencies (the client's approval of finishes, the society's work hours, appliance delivery), and the warranty: what is covered, for how long, and what voids it. Hardware warranties are given by brands; workmanship warranty is given by the firm, and the two should be listed separately.

Comparing three quotations fairly

Comparing quotations is a normalising exercise. Before anyone looks at totals, the three documents must be brought to the same scope and the same specification. Make a single sheet with one row per item from the drawings and one column per firm. Fill in each firm's size, unit, specification and amount. Wherever one firm has left something out, add a realistic figure for it; wherever one has quoted a lower grade, note the difference. Only then compare totals. The example below shows how a quote that looks cheapest becomes the most expensive once it is normalised.

LineFirm AFirm BFirm C
Quoted total (before GST)₹19.0 lakh₹16.8 lakh₹17.9 lakh
Carcass board18 mm BWR plywood18 mm MR plywood18 mm BWR plywood
HardwareSoft-close, brand named"Branded", unnamedSoft-close, brand named
LoftsIncludedExcludedIncluded
BedsThree, with storageTwo onlyThree, with storage
Site work and contingencyIncluded"At actuals"Included, provisional
Normalising additions—+ lofts, third bed, site work, board upgrade ≈ ₹3.4 lakh+ cove lighting missing ≈ ₹0.4 lakh
Comparable total₹19.0 lakh≈ ₹20.2 lakh≈ ₹18.3 lakh

After normalising, Firm C is the lowest and Firm B — the cheapest on paper — is the highest, because its quotation left out items the family will still need and specified a board grade that the others did not. This is the most common pattern in interior pricing. It does not mean the cheapest quotation is dishonest; it means the cheapest quotation is often a different product. The normalised sheet also makes negotiation fair: the family can ask Firm A why its wardrobe rate is higher than Firm C's for the same specification, instead of asking everyone for "best price".

Red flags that predict extras and disputes

Red flagWhat it usually hidesWhat to ask for
Single per-sq-ft rate for the whole homeUndefined scope; items outside the package billed as extrasAn itemised BOQ against the drawings
No drawing reference or revisionNothing to check sizes againstDrawing list and revision on the cover page
"Premium", "branded", "best quality" without namesThe cheapest option that fits the wordBrand, series, grade and thickness on every line
Large lump sums for measurable workPadding, or no way to vary fairlyUnit, quantity and rate
"At actuals" without ratesOpen-ended billingRates for likely extras written in advance
Most of the payment before site workClient financing the project; weak leverageMilestones tied to visible progress and a retention
No GST line or GSTINTax added later, or an unregistered vendorGST shown separately; GSTIN on the quotation
No validity datePrices revised after signingValidity period and price-escalation clause

Where interior quotations are going

Quotations are slowly becoming data rather than documents. Design software can now produce a bill of quantities directly from the 3D model, so that moving a wall or changing a shutter finish updates the quantities and the price together. Factories that cut panels on CNC machines can quote from their own cutting lists, which makes board consumption measurable rather than estimated. Project-tracking apps let clients see each line's status — ordered, delivered, installed — and tie payments to those milestones. And GST e-invoicing for larger businesses has made tax invoices more structured and easier to check. None of this replaces careful reading. A model-generated BOQ is only as good as the specification behind it, and a client still needs to know what a sq ft of elevation measures.

Rules for reading any interior quotation

  • Check the drawing reference first — the quotation must name the drawing set and revision it prices.
  • Read the unit before the rate: sq ft of elevation, running foot, sq ft of area, per point, nos or lump sum.
  • Recalculate three or four rows yourself — size to quantity, quantity × rate to amount.
  • Insist on board, thickness, finish, edge band and hardware brand on every furniture line.
  • List the exclusions on one page and budget for them separately.
  • Make sure provisional sums state what they cover and the rates for actual work.
  • Confirm whether rates include GST, and that the GSTIN is on the quotation.
  • Tie payments to visible progress, keep a 5–10 per cent retention, and price every variation in writing before it is done.
  • Normalise competing quotes to the same scope and specification before comparing totals.

Frequently asked questions

What is a BOQ in interior design?

A BOQ, or bill of quantities, is the itemised schedule at the heart of a quotation. It lists every item of work with its description, specification, size, unit of measurement, quantity, rate and amount. It lets the client check what is included, compare quotations line by line, and price any changes fairly.

What does per sq ft mean in an interior quotation?

For furniture it usually means square feet of front elevation — width × height of the unit's face — not floor area and not material used. For ceilings and flooring it means area, and for painting it means paintable surface. Always check which one the quotation uses and what depth, internal fittings and finish the rate covers.

Is GST charged on interior design work?

Yes. Interior contracts and design services commonly attract GST, typically at 18 per cent. The quotation should show GST as a separate line with the firm's GSTIN, and rates should be clearly marked as inclusive or exclusive of tax. Confirm the current rate and the firm's registration before signing.

How much advance should I pay an interior designer?

For execution, a booking advance of about 10–20 per cent is common and balanced, followed by payments linked to material delivery, installation and finishing, with 5–10 per cent held until snags are closed. Design fees, where separate, are usually paid in stages. Be cautious of schedules that ask for most of the money before work is visible on site.

Why is one interior quotation so much cheaper than another?

Usually because it describes less work or lower specifications: a lower board grade, unnamed hardware, missing lofts or beds, or site work left "at actuals". Normalise the quotations to the same scope and specification before comparing totals; the cheapest on paper is often not the cheapest in the end.

Sources & standards

  1. Bureau of Indian Standards — IS 1200 series: Method of measurement of building and civil engineering works
  2. Bureau of Indian Standards — IS 303 (plywood for general purposes) and IS 710 (marine plywood)
  3. Central Board of Indirect Taxes and Customs — GST on works contracts and services; checking GSTIN and tax invoices
  4. Indian Contract Act, 1872 — offer, acceptance and the terms of a written contract
  5. Consumer Protection Act, 2019 — rights of consumers buying services
  6. National Building Code of India 2016, Part 8 (Building Services) — electrical installations referenced in electrical scope
  7. Council of Architecture — guidance on conditions of engagement and professional fees
  8. Price ranges: indicative October 2026 estimates — confirm locally before budgeting
Discuss your project

Keep Reading

Related articles

All articles →
Warranties and After-Sales in Interior Projects — cover
Process & Trust

Warranties and After-Sales in Interior Projects

An interior project carries two kinds of warranty: the firm's workmanship warranty, commonly one to two years on carpentry and installation, and manufacturers' warranties on boards, hardware, appliances and fittings, which run for their own periods and conditions. Get both in writing at handover, with response times, exclusions and a named service contact, and keep the 5–10 per cent retention until snags are closed.

Moving Into a New Flat: Interior Checklist — cover
Process & Trust

Moving Into a New Flat: Interior Checklist

Moving into a new flat takes about 16–20 weeks from possession if interiors are done properly: documents and snag list first, services tested before any carpentry, work done in a fixed order, and a deep clean and pest treatment before the furniture arrives. The checklist below puts every step, measurement and indicative cost in sequence.

Designing a Home While Living in It: Renovation Tips — cover
Process & Trust

Designing a Home While Living in It: Renovation Tips

A home can be renovated while the family lives in it if the work is phased — noisy civil work grouped into one block, rooms done one at a time, one bathroom and a temporary kitchen always working, and every zone sealed against dust. Expect the programme to stretch by roughly a quarter to a half compared with an empty home, and budget about ₹40,000–1,20,000 extra for protection, storage, cleaning and a temporary kitchen.