Blog · Topic

Process & Trust

16 articles from the partners' desk.

← All articles

Warranties and After-Sales in Interior Projects — cover
Process & Trust

Warranties and After-Sales in Interior Projects

An interior project carries two kinds of warranty: the firm's workmanship warranty, commonly one to two years on carpentry and installation, and manufacturers' warranties on boards, hardware, appliances and fittings, which run for their own periods and conditions. Get both in writing at handover, with response times, exclusions and a named service contact, and keep the 5–10 per cent retention until snags are closed.

Moving Into a New Flat: Interior Checklist — cover
Process & Trust

Moving Into a New Flat: Interior Checklist

Moving into a new flat takes about 16–20 weeks from possession if interiors are done properly: documents and snag list first, services tested before any carpentry, work done in a fixed order, and a deep clean and pest treatment before the furniture arrives. The checklist below puts every step, measurement and indicative cost in sequence.

Designing a Home While Living in It: Renovation Tips — cover
Process & Trust

Designing a Home While Living in It: Renovation Tips

A home can be renovated while the family lives in it if the work is phased — noisy civil work grouped into one block, rooms done one at a time, one bathroom and a temporary kitchen always working, and every zone sealed against dust. Expect the programme to stretch by roughly a quarter to a half compared with an empty home, and budget about ₹40,000–1,20,000 extra for protection, storage, cleaning and a temporary kitchen.

Moodboards and Material Boards Explained — cover
Process & Trust

Moodboards and Material Boards Explained

A moodboard fixes the feeling of a home — light, colour, texture and style — before any drawing is made; a material board fixes the actual laminates, stones, fabrics and finishes, as real samples, before anything is ordered. Approving both, in the right order and under the right light, prevents most of the expensive 'this is not what I imagined' moments on site.

Working Drawings Explained for Homeowners — cover
Process & Trust

Working Drawings Explained for Homeowners

Working drawings are the dimensioned, coordinated construction set — plans, sections, elevations, details and schedules — that a contractor builds from, issued as Good for Construction (GFC) after design is frozen. A homeowner does not need to draw them, but should know what the set must contain, how to read dimensions, levels and revisions, and what to check before signing off.

2D Drawings vs 3D Renders: What You Should Receive — cover
Process & Trust

2D Drawings vs 3D Renders: What You Should Receive

3D renders show what a room will look like; 2D drawings say exactly how to build it, with every dimension in mm, and a home interior needs both. For a typical 3BHK, expect a written drawing list covering the measured plan, furniture layout, ceiling, electrical and lighting, plumbing, flooring, wall elevations and joinery details, plus roughly 12–25 render views at about ₹2,000–10,000 per view (indicative October 2026).

Snag List: How to Check Your Home Before Handover — cover
Process & Trust

Snag List: How to Check Your Home Before Handover

A snag list is a written, photographed record of every defect found in a home before the keys or the final payment change hands — walls, floors, doors, windows, plumbing, electrical and finishes, checked room by room with a level, a straight edge, a socket tester and a bucket of water. Done properly it takes three to five hours for a 3BHK, and it is far easier to get defects fixed before handover than after.

Site Supervision: What Should Happen Every Week — cover
Process & Trust

Site Supervision: What Should Happen Every Week

Good supervision is a weekly rhythm, not a visit when someone calls: a Monday look-ahead, daily checks by the site supervisor, a mid-week inspection of every stage about to be covered, a weekly site meeting and a written report with photographs, a snag list and the next week's plan. The non-negotiable part is the hold point — no conduit, pipe, membrane, ceiling grid or carcass is closed until it has been checked and signed off.

How Long Do Home Interiors Take: Real Timelines — cover
Process & Trust

How Long Do Home Interiors Take: Real Timelines

A mid-range 2BHK or 3BHK with factory-made furniture typically takes 10–16 weeks on site after design sign-off, plus 2–4 weeks of design (6–10 weeks when every room is detailed in 3D). A 1BHK can finish in 6–10 weeks; premium homes and resale flats with heavy civil work run 18–24 weeks or more.

Payment Schedule for Interior Projects — cover
Process & Trust

Payment Schedule for Interior Projects

A balanced interior payment schedule takes a booking advance of about 10–20 per cent, ties the next payments to verifiable stages — materials delivered, carcasses installed, finishes complete, handover — and keeps a 5–10 per cent retention until the snag list is closed. On a ₹19 lakh mid-range 3BHK, that keeps the client's money no more than about ₹1–2 lakh ahead of the work at any point.

Interior Design Contract: Clauses You Must Have — cover
Process & Trust

Interior Design Contract: Clauses You Must Have

A fair interior design contract fixes the scope against drawings and a specification, states the price and its basis with GST shown, ties payments to verified milestones with a 5–10 per cent retention, and sets the timeline, variation process, warranty, drawing ownership, exit terms and dispute route in writing. Most disputes come from clauses that were missing, not from clauses that were broken.

How to Read an Interior Design Quotation — cover
Process & Trust

How to Read an Interior Design Quotation

A good interior quotation is a priced specification: every line names the item, its size, the unit it is measured in, the board, finish and hardware, the quantity, the rate and the amount, with exclusions, GST and payment milestones written out. Two quotes can only be compared after they are brought to the same scope and specification — the total alone says almost nothing.

Turnkey Interiors vs Design-Only: Which Is Better — cover
Process & Trust

Turnkey Interiors vs Design-Only: Which Is Better

Design-only buys drawings and specifications, and the family then hires and manages every contractor; turnkey buys one contract for design and execution, with one party responsible for cost, quality and time. On a typical 3BHK the totals land in a similar band — the real difference is who carries the risk and how much of the family's time the project consumes.

Questions to Ask Before Hiring an Architect — cover
Process & Trust

Questions to Ask Before Hiring an Architect

Before hiring an architect, confirm Council of Architecture registration, see built work, and get the scope, drawing list, site-visit count and fee basis in writing. For an independent house, full-service fees are commonly quoted at about 4–10 per cent of construction cost or as a per-sq-ft or lump-sum figure, paid in stages tied to deliverables.

How to Hire an Interior Designer: Complete Checklist — cover
Process & Trust

How to Hire an Interior Designer: Complete Checklist

Hire an interior designer the way a business hires a key supplier: write a brief and budget first, shortlist three to five firms, visit at least one finished and one running site for each, and compare proposals line by line rather than by headline rate. Then sign a written contract that fixes scope, drawings, specifications, timeline, payment milestones tied to work done, variations, warranty and exit terms.

Restaurant interior by Aaditya Interior
Process & Trust

What We Check on Every Site Visit

A design is only as good as its build. Here is the checklist our team carries to every site – and the reasons behind it.